Despite the probe being ready by 2023.
There are a lot of inherent costs per year that are sunk-costs in running a program of this scale.
Should they exist at the same time? That is a measurement of the characteristic energy to get to a certain point in space.
I am as guilty of as anyone, because everything depends on what will happen with their current step.